Sample Questions

# Chapter Title Question
12 Alarm Inspections, Testing and Maintenance How often shall detectors be tested?
10 Conduits, Voltmeters, Ammeter and Ohmmeter __________ conduit is the only rigid non-metallic conduit that may be used above ground.
9 Electric Power Conditioning and Mechanical Electrical Lamp pole for exterior use is located 20 ft. away from the building. What type of raceway would be used?
5 Electrical Branch Circuits Dual Element Fuse =
14 Electrical Miscellaneous, Conductors, Wires, Panels, EMT and Currents Regarding wind pressure calculation: Load in Newtons = 0.613 . (V m/s) 2 . kz . GRF. I . Cf . A(m__________)
4 Electrical Systems, Cables, Wires and Electrical Sign Installation A sign can be used as a pull box or junction box for adjacent signs, outline lighting systems, or floodlights that __________..
8 Electrical Transmission Lines and Communication Lines A messenger that is effectively grounded throughout its length will have the same clearance from the communications facilities that are required for a neutral conductor meeting regarding Rule __________ in reference to fiber optic supply.
3 Electrical, Connections, Panel Boards and Grounding What clearance is required for the front of a 208/120 panel?
2 Electrical, Heaters, Conductors, Bonding and Voltage 120/240 V single phase system with single black-red-white conductors (installed in single conduit) select "single set of conductors", 120/208 V 3 phase system with 2 conductors per phase and neutral (installed in 2 parallel conduits) select "__________ conductors per phase in parallel", dc system with 3 positive and 3 negative conductors select "3 conductors per phase in parallel".
1 Electrical, Wires, Cables and Raceways For most 120/240V systems using cables of adequate ampacity, voltage drop is not a concern unless cable lengths are well over a hundred feet.
13 Emergency Alarm Communication Systems, Control Functions and Interfaces What do smoke detectors mounted in the air ducts of HVAC systems do?
18 Labors, Employees, Contractors, Insurance and Safety OSHA form 200, log and summary of occupational injury must be kept for how many years?
16 Mathematics, Calculations and Formulas 150(2)+150(2)=45,000-150(150)=45000-22500=22500/150N=__________ A
6 Motor Controls and Occupancies The smallest bonding conductor permitted for pool equipment is No. __________ AWG.
7 NEC and Electrical Equipment The first step in solving a low voltage problem on a circuit is to leave the voltmeter leads connected across the line, and then begin __________.
15 Photovoltaics __________ is a I-III-VI2 semiconductor material composed of copper, indium, gallium, and selenium. It has a chemical formula of CuInxGa(1-x)Se2
11 Protected Premises, Fire Alarm Systems and Fundamentals Every low power radio transmitter will automatically repeat alarm transmission at intervals not exceeding __________ seconds until the initiating device is returned to its normal alarm condition.
17 Safety and Asbestos - Code of Federal Regulations, Title 29, Part 1926 Within 8 hours after the death of any employee or report of the inpatient hospitalization of __________ or more employees, as the result of a work-related incident, you must report this to the closest OSHA office.
99 USA Dig Alert The ##DIG_ALERT_COMPANY## markings are valid __________.