These are actual questions from our online practice test.

We have included a question from each chapter of the test. Every question will be multiple choice. The answers are not included with the sample.

Sample Questions

# Chapter Title Question
1 Insulation The relationship between R-value and U-value is _________.
2 Windows and Doors Two window jambs joined is called?
3 Finishing/Windows A ____________ edge is free from wane and without eased edges.
4 Installation and Cabinetry A __________ is generally any horizontal decorative molding that crowns a building or furniture element.
5 Hinges, Hardware and Pulls Made of solid brass a ____________ hook features 2 pivoting points allowing it to move in and out plus move up and down. It can be used on any type of door, including cabinet doors, to lock in closed and/or open positions.
6 Safety and Closets All closet organizers are 84 inches tall?
7 Molding A ___________ cut consists of two angles, the bevel angle and the miter angle.
8 Finish Carpentry

How much space does building code allow an attic to contain?

9 Thermal Moisture Protection When estimating wood siding takeoffs, allowances for ________ should be included.
10 Wood Flooring How does moisture affect a hardwood floor?
11 Siding Regarding angle setting for sliding compound miter saw, if the spring angle in degrees for the crown is 52, the miter angle on table in degrees is 38, then the bevel tilt of blade in degrees would be ________.
12 Drywall Materials, Firewalls and Hangers

What are the most common injuries in the drywall trade and how do they result?

13 Drywall Handling and Installation

All fire rated enclosures must be taped with drywall tape and taping _____ before they are closed up completely.

14 Metal Studs

What are the standard lengths of metal studs?

15 Drywall System

What is exterior drywall sheathing designed to be applied under?

16 Taping, Texturing and Installing Drywall

What does the 1/4 inch gap do?

17 Framing and Rough Carpentry When cutting stock lumber, material should be cut ___in. wider than needed.
18 Framing, Joists and Exposed Beams Solid slab floors systems are supported by beams or ______.
18 Machines and Power Tools A _____________ is a woodworking tool consisting of a circular saw blade, mounted on an arbor, that is driven by an electric motor
19 Definitions A _______________ tool features perforated sheet metal and resembles a food grater.
20 Safety, Dig Alert and Fire Extinguishers

If an emergency notice must be given to Blue Stakes of Utah 811 Dig Alert, the utility company will attempt to respond within _______.

21 OSHA Standards, Asbestos and Code of Federal Regulations Title 29, Part 1926

Regarding section 1926.1101(g)(4)(ii), For all Class I jobs involving the removal of more than ____________ linear or 10 square feet of thermal system insulation or surfacing material; for all other Class I jobs, where the employer cannot produce a negative exposure assessment pursuant to paragraph (f)(2)(iii) of this section, or where employees are working in areas adjacent to the regulated area, while the Class I work is being performed, the employer shall use one of the following methods to ensure that airborne asbestos does not migrate from the regulated area:

22 Mathematics, Calculations and Formulas An experienced carpenter can panel a room 3 times faster than an apprentice can. Working together they can panel the room in 6 hours. How long would it take each one working alone to do the job?