Practice tests are comprised of independent chapters, each testing you on the specific subjects within the trade.
#
|
Title
|
Questions
|
1
|
ADA Parking Requirements
|
13
|
2
|
Asphalt Paving, Subsurface, Drainage and Hot-Mix Paving
|
35
|
3
|
Close-Fit Pipe and Cured In Place Pipe
|
21
|
4
|
Earthworks, Clearing, Excavating and Surveying
|
37
|
5
|
Excavating and Grading
|
29
|
6
|
Excavating and Sitework
|
12
|
7
|
Excavating, Drainage, Compaction and Trenching
|
41
|
8
|
Horizontal Auger Boring, Pipe Ramming, Pipe Jacking and Utilitity Tunneling
|
28
|
9
|
Horizontal Directional Drilling
|
24
|
10
|
Installation, Joints, Field Elevations, Sewers and Sewer Testing
|
25
|
11
|
Installation, Pipes, Drainage and Trenches
|
29
|
12
|
Installation, Pipes, Leach Fields and Tanks
|
24
|
13
|
Job Safety Traffic Control
|
33
|
14
|
Localized Repair, Sewer Pipelines, Thermo-formed Pipe and Sewer Manhole Renewal
|
33
|
15
|
Maintenance Repair and Sewer Lateral Renewal
|
30
|
16
|
Mathematics, Calculations and Formulas
|
26
|
17
|
Micro-Tunneling Methods and Pilot Tube Micro-Tunneling
|
29
|
18
|
Miscellaneous
|
19
|
19
|
OSHA Safety, Asbestos, and Code of Federal Regulations, Fire Extinguishers
|
23
|
20
|
Pipe In-Line Replacement, Coatings and Linings Underground
|
28
|
21
|
Pipe Materials
|
25
|
22
|
Pipe Welding, Installing and Ductile Iron Pipes
|
29
|
23
|
Pipeline Management, Inspection, Cleaning and Coatings and Control Corrosion
|
30
|
24
|
Sanitary Sewers, Storm Sewers and Septic Tanks
|
37
|
25
|
Slip-lining and Modified
|
30
|
26
|
Trenchless Pipeline Construction Methods, Designs and Renewal Methods
|
20
|
27
|
Trenchless Technologies
|
19
|
28
|
Underground Utilities, Drainage, Pipelines and System Location Sites
|
42
|
29
|
USA Dig Alert
|
22
|
30
|
Welding, Brazing, Arc, Oxyacetylene, Testing and Inspection
|
43
|
|
Total =
|
836
|