Practice tests are comprised of independent chapters, each testing you on the specific subjects within the trade.
#
|
Title
|
Questions
|
1
|
Asphalt Paving, Subsurface, Drainage and Hot-Mix Paving
|
35
|
2
|
Basic Estimating and Blueprint Reading
|
24
|
3
|
Blasting
|
18
|
4
|
Concrete and Unbonded Post-Tensioned,
|
18
|
5
|
Concrete Formwork and Shotcrete
|
45
|
6
|
Concrete, Foundations and Piles
|
32
|
7
|
Construction Definitions
|
28
|
8
|
Earthworks, Excavating and Surveying
|
31
|
9
|
Excavating and Sitework
|
19
|
10
|
Excavating, Drainage, Compaction and Trenching
|
35
|
11
|
Grading, Compaction and Soils
|
21
|
12
|
Horizontal Auger Boring, Pipe Ramming and Blasting
|
33
|
13
|
Installing Irrigation Pipes
|
44
|
14
|
Job Safety, Traffic Control and ADA Parking Requirements
|
37
|
15
|
Joists and Girders
|
44
|
16
|
Mathematics, Calculations and Formulas
|
13
|
17
|
Micro-Tunneling Methods, Pipe Jacking, Pilot Tube Micro-Tunneling and Utilities
|
36
|
18
|
OSHA Safety, Asbestos and Training
|
50
|
19
|
Pipe Welding, Installing and Ductile Iron Pipes
|
29
|
20
|
Pipeline Management, Inspection Cleaning, Coatings and Control Corrosion
|
34
|
21
|
Plumbing, PSI, Water Pressure, Water Flow, Pipelines and Water Pressure
|
24
|
22
|
Plumbing, Valves, Gas Pipes, Oxygen, Gas Cylinders and Water Heaters
|
38
|
23
|
Sanitary Sewers, Storm Sewers and Septic Tanks
|
29
|
24
|
Sewer Installation, Cast Iron Pipes, Drainage and Trenches
|
18
|
25
|
Sewer Installation, Joints, Field Elevations and Sewer Testing
|
25
|
26
|
Sewer Installation, Pipes, Leach Fields and Tanks
|
24
|
27
|
Sewer System Design, Tank Size, Soils, Pathogens and Gases
|
25
|
28
|
Sewer System Location Sites and Soil Conditions
|
23
|
29
|
Steel Framing, Steel Columns and Steel Erection
|
41
|
30
|
Structural, Reinforcing Steel, Rebar and Ties
|
31
|
31
|
Surface Coatings and Striping
|
30
|
32
|
Swimming Pool Construction, Soils, Earthwork and Pipes
|
40
|
33
|
Underground Utilities, Drainage, Pipeline and Electrical Transmission Lines
|
38
|
34
|
USA Dig Alert
|
21
|
35
|
Welding, Blazing, Arc, Oxyacetylene, Testing and Inspection
|
43
|
|
Total =
|
1076
|