Practice tests are comprised of independent chapters, each testing you on the specific subjects within the trade.
#
|
Title
|
Questions
|
1
|
ADA Parking Requirements
|
13
|
2
|
Asphalt Paving Subsurfaces and Drainage
|
21
|
3
|
Blasting
|
18
|
4
|
Coatings and Control Corrosion
|
15
|
5
|
Concrete Formwork and Shotcrete
|
45
|
6
|
Concrete, Foundations and Piles
|
33
|
7
|
Concrete, Unbonded and Post-Tensioned
|
24
|
8
|
Earthworks, Excavating and Surveying
|
30
|
9
|
Electrical Transmission Lines, Gas Transmission and Distribution Systems
|
16
|
10
|
Employees, Contractors, Insurance, Safety and Training
|
19
|
11
|
Excavating, Drainage, Compaction and Trenching
|
35
|
12
|
Grading, Compaction and Soils
|
25
|
13
|
Hot-Mix Paving
|
14
|
14
|
Job Safety Traffic Control
|
24
|
15
|
Joists and Girders
|
44
|
16
|
Miscellaneous
|
30
|
17
|
OSHA Standards, Asbestos, Code of Federal Regulations, Title 29, Part 1926 and Mathematics
|
21
|
18
|
OSHA, Safety and Fire Extinguishers
|
31
|
19
|
Photovoltaics
|
36
|
20
|
Pipe Welding, Installing and Ductile Iron Pipes
|
29
|
21
|
Pipeline Management, Inspection and Cleaning
|
19
|
22
|
Plumbing, PSI, Water Pressure, Water Flow, Pipelines and Water Pressure
|
24
|
23
|
Plumbing, Valves, Gas Pipes, Oxygen, Gas Cylinders and Water Heaters
|
38
|
24
|
Sanitary Sewers, Storm Sewers and Septic Tanks
|
29
|
25
|
Sewer Installation, Cast Iron Pipes, Drainage and Trenches
|
18
|
26
|
Sewer Installation, Joints, Field Elevations and Sewer Testing
|
24
|
27
|
Sewer Installation, Pipes, Leach Fields and Tanks
|
24
|
28
|
Sewer System Design, Tank Size, Soils, Pathogens and Gases
|
25
|
29
|
Sewer System Location Sites and Soil Conditions
|
23
|
30
|
Solar Collector Installation
|
30
|
31
|
Solar Installation Panels and Roofs
|
11
|
32
|
Solar Thermal Systems, Panels, Collectors and Formulas
|
22
|
33
|
Steel Framing, Steel Columns and Steel Erection
|
41
|
34
|
Structural, Reinforcing Steel, Rebar and Ties
|
31
|
35
|
Surface Coatings and Striping
|
30
|
36
|
Underground Utilities, Drainage and Pipelines
|
28
|
37
|
USA Dig Alert
|
22
|
38
|
Welding, Blazing, Arc, Oxyacetylene, Testing and Inspection
|
43
|
|
Total =
|
1005
|